Sound Properties
Lacey, WA
Client: Sound Properties Dev.
Cost: $14,000,000
Completion Date: est. 2007
Project Requirements: Supply traffic impact analysis,
water system design, gravity sewer, drainage design and erosion
control plans, grading plan, and permitting.
|
 |
Farm Bureau
Lacey, WA
Client: Kirkbride Group
Cost: $8,000,000
Completion Date: 2006
Project Requirements: Supply traffic impact
analysis, water system design, gravity sewer down Carpenter
Road, drainage design and erosion control plans,
grading plan, and permitting.
|
 |
Olympia Bible Baptist Church
Olympia, WA
Client: Olympia Bible Baptist Church
Cost: $700,000
Completion Date: 2006
Project Requirements: Supply site design,
traffic impact analysis, hydraulic report and erosion control plans,
stormwater site plans, water system supply, sewer collection
design, permitting, grading plan, and rendering.
|
 |
Tumwater Center
Tumwater, WA
Client: Kirkbride Group
Cost: $1,600,000
Completion Date: 2004
Project Requirements: Traffic impact analysis,
hydraulic report and erosion control plans, stormwater collection, water
system supply, sewer collection design, grading plan. |
 |
Port of Allyn - North Shore Marina
Allyn, WA
Client: Port of Allyn
Cost: $200,000
Completion Date: 2002
Project Requirements: Design pier ramp and
floats. Design electrical, water, and boat pumpout for the boats.
Create plans and specifications for construction. |
 |
Fort Columbia Historical Restoration
Fort Columbia State Park
Client: Washington State Parks
Cost: $120,000
Completion Date: 1997
Project Requirements: Supply project management,
historical research, cost estimates, engineering designs, construction
inspection and project compliance.
|
 |
 |
Trotter Downs - Phase I
Rainier, WA
Client: Avalanche Development
Cost: $1,400,000
Completion Date: 2006
Project Requirements: Supply traffic impact analysis, hydraulic report and erosion control plans, stormwater site plans, roadway realignment, frontage improvements and design sidewalks, water system and OSS septic designs.
|
 |
Leo Lemoine
Rainier, WA
Client: Leo Lemoine
Cost: $250,000
Completion Date: 2003
Project Requirements: Complete access road designs, stormwater, on-site septic designs, and provide construction drawings and specifications for completion. |
 |
Private Grinder Pump Installation
Lacey, WA
Client: Denis Curry
Cost: $20,000
Completion Date: 2002
Project Requirements: Design a private pump station with connections to city sewer. Provide plans and specifications for bids. Evaluate bid responses. |
|
|
|