commercial projects
Sound Properties, Lacey, WA

Sound Properties
Lacey, WA

Client: Sound Properties Dev.
Cost: $14,000,000
Completion Date: est. 2007
Project Requirements: Supply traffic impact analysis, water system design, gravity sewer, drainage design and erosion control plans, grading plan, and permitting.

Farm Bureau, Lacey, WA

Farm Bureau
Lacey, WA

Client: Kirkbride Group
Cost: $8,000,000
Completion Date: 2006
Project Requirements: Supply traffic impact analysis, water system design, gravity sewer down Carpenter Road, drainage design and erosion control plans, grading plan, and permitting.

Olympia Bible Baptist Church, Olympia, WA

Olympia Bible Baptist Church
Olympia, WA

Client: Olympia Bible Baptist Church
Cost: $700,000
Completion Date: 2006
Project Requirements: Supply site design, traffic impact analysis, hydraulic report and erosion control plans, stormwater site plans, water system supply, sewer collection design, permitting, grading plan, and rendering.

Tumwater Center, Tumwater, WA

Tumwater Center
Tumwater, WA

Client: Kirkbride Group
Cost: $1,600,000
Completion Date: 2004
Project Requirements: Traffic impact analysis, hydraulic report and erosion control plans, stormwater collection, water system supply, sewer collection design, grading plan.

Port of Allyn - North Shore Marina, Allyn, WA

Port of Allyn - North Shore Marina
Allyn, WA

Client: Port of Allyn
Cost: $200,000
Completion Date: 2002
Project Requirements: Design pier ramp and floats. Design electrical, water, and boat pumpout for the boats. Create plans and specifications for construction.

Fort Columbia Historical Restoration, Fort Columbia State Park

Fort Columbia Historical Restoration
Fort Columbia State Park

Client: Washington State Parks
Cost: $120,000
Completion Date: 1997
Project Requirements: Supply project management, historical research, cost estimates, engineering designs, construction inspection and project compliance.


residential projects
Trotter Downs - Phase I, Rainier, WA

Trotter Downs - Phase I
Rainier, WA

Client: Avalanche Development
Cost: $1,400,000
Completion Date: 2006
Project Requirements: Supply traffic impact analysis, hydraulic report and erosion control plans, stormwater site plans, roadway realignment, frontage improvements and design sidewalks, water system and OSS septic designs.

Leo Lemoine, Rainier, WA

Leo Lemoine
Rainier, WA

Client: Leo Lemoine
Cost: $250,000
Completion Date: 2003
Project Requirements: Complete access road designs, stormwater, on-site septic designs, and provide construction drawings and specifications for completion.

Private Grinder Pump Installation, Lacey, WA

Private Grinder Pump Installation
Lacey, WA

Client: Denis Curry
Cost: $20,000
Completion Date: 2002
Project Requirements: Design a private pump station with connections to city sewer. Provide plans and specifications for bids. Evaluate bid responses.

   

 